Concept rendering — an Atlas private grid campus at dawn
Private Grid Power

Power at the speed of ambition.

Dedicated behind-the-meter generation — 50 to 500 MW — designed, financed, built, owned, and operated by Atlas. Energized in 9 to 14 months, not years.

Concept rendering
The Bottleneck

Compute isn't waiting on chips. It's waiting on electrons.

AI campuses, server manufacturers, and reshored industry are queuing years for utility interconnection — while finished facilities sit dark. Every month without power is unrealized revenue.

Typical utility interconnectionMulti-year queue
36–60+ mo
Atlas private gridContract to energization
9–14 mo
The Model

Bridge. Permanent. Partnership.

One partner across the full power lifecycle — so your capital, your people, and your attention stay on your business.

STEP 01

Bridge power

Mobile generation arrives onsite in weeks. Construction, commissioning, and early operations begin immediately — no waiting on the queue.

STEP 02

Permanent plant

A dedicated behind-the-meter facility — 50 to 500 MW of high-efficiency natural gas generation — engineered, financed, and built by Atlas.

STEP 03

Long-term operation

Atlas owns and operates the system under multi-year power purchase agreements, with 24/7 monitoring and field service.

Atlas bridge power deployment diagram
Bridge power — mobile generation during construction
Atlas behind-the-meter private grid diagram
Permanent behind-the-meter private grid
The Buildout

From first contract to two gigawatts.

Already In Motion

Funded. Supplied. Under contract.

APR 2026

120 MW private-grid PPA

A 5-year agreement — with two 5-year extension options — signed with an investment-grade technology infrastructure customer. Bridge power onsite since March 2026; full energization targeted for the first half of 2027, with ~$50–55M of annualized adjusted free cash flow expected at full operation.

MAR 2026

~1.4 GW Caterpillar supply agreement

Roughly $840M of generation equipment reserved through 2030 — securing the scarcest input in the power market before it tightened, and guaranteeing delivery schedules customers can plan around.

FEB 2025

Moser Energy Systems platform

A $220M acquisition bringing five decades of distributed natural-gas generation experience — hundreds of units running in remote, harsh environments long before "behind the meter" was a headline.

Concept rendering — a powered campus on the desert horizon at sunset
Who We Power

Built for the loads the grid can't reach.

Wherever the queue is the bottleneck — compute, manufacturing, industry — Atlas brings the plant to the load.

Concept rendering
AI
Data centers & compute campuses
MFG
Advanced & reshored manufacturing
O&G
Production, midstream & electrification
IND
Large industrial & municipal loads
Get Started

Tell us your load. We'll tell you your timeline.

A power assessment maps your capacity needs, site, fuel access, and schedule against the Atlas deployment pipeline.

Start a Power Assessment